x
  • Services
  • Clients
  • Portfolio
  • B2B (New)

Infracore

Home | technology | Consultancy

  • PRE-CONTRACT
    • Consultancy
    • Design
    • Tendering
    • Value Engineering

      • What is it?AN EXERCISE IN MAINTAINING QUALITY WHILST REDUCING COSTS
      • Who Is It For?FOR THE PERSON IN CHARGE OF THE NUMBERS
      • Why Do You Need It?TO SAVE MONEY
      • Where Does It Fit In?MOSTLY INSIDE THE TENDER STAGE
      • When Do You Need It?IDEALLY BEFORE YOU APPOINT
      Click Here For More Info
    • Client Questionnaire

      • What is it?A MOSTLY MULTIPLE CHOICE CHECK LIST OF WANTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO BEGIN THE PROCESS OF UNDERSTANDING THE REQUIREMENT
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?DURING THE FIRST OR SECOND CONSULTATION
      Click Here For More Info
    • VAT Exemptions

      • What is it?GUIDANCE ON DIFFERENT VAT RATES IN CONTEXT OF CONTRACT
      • Who Is It For?FOR YOUR AV/SYSTEM INTEGRATOR
      • Why Do You Need It?TO ENSURE CORRECT RATES OF VAT ARE APPLIED
      • Where Does It Fit In?INSIDE TENDER INVITE PACK
      • When Do You Need It?DURING STAGE ONE TENDER
      Click Here For More Info
    • Existing System Audit

      • What is it?A FULL SYSTEM HEALTH CHECK. ALL ROOMS. ALL COMPONENTS
      • Who Is It For?FOR THE OWNER (OR FUTURE OWNER)
      • Why Do You Need It?TO IDENTIFY WHAT'S WORKING, WHAT'S NOT AND REMEDIAL COSTS
      • Where Does It Fit In?INSIDE A LARGER PROPETY SURVEY
      • When Do You Need It?BEFORE YOU DECIDE TO UPGRADE/CHANGE/FIX/COMMIT
      Click Here For More Info
    • System Takeover Report

      • What is it?WHAT YOU NEED TO KNOW BEFORE YOU CHANGE AV SUPPLIER
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?KNOW YOUR POSITION BEFORE YOU MAKE A CHANGE
      • Where Does It Fit In?ALONG SIDE EXISTING PROJECT INFO OR O&M
      • When Do You Need It?BEFORE YOU APPOINT A NEW SUPPLIER
      Click Here For More Info
    • Performance Spec
      and Cost Summary

      • What is it?A SNAPSHOT OF WHAT YOU'RE GETTING AND HOW MUCH IT COSTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO SAVE YOU HAVING TO READ ALL PROJECT DOCS
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?BEFORE YOU MOVE TO DETAILED DESIGN
      Click Here For More Info
    • AVGA

      • What is it?Audio Visual General Arrangement
      • Who Is It For?Primarily for the end user
      • Why Do You Need It?TO MAKE SURE YOU KNOW ALL YOU NEED TO ABOUT A ROOM
      • Where Does It Fit In?Inside Concept Design
      • When Do You Need It?Before you start detailed design
      Click Here For More Info
    • QUICK REF SCHEMATIC

      • What is it?A QUICK REFERENCE SCHEMATIC
      • Who Is It For?THE FIRST FIXERS
      • Why Do You Need It?IT'S QUICK AND EASY TO FOLLOW
      • Where Does It Fit In?THE CONSTRUCTION ISSUE PACK
      • When Do You Need It?BEFORE YOU START FIRST FIX
      Click Here For More Info
    • MATRICES & SPEC SHEETS

      • What is it?PRODUCTS MATRICES AND DETAILED SPECIFICATIONS
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?IT GIVES YOU OPTIONS AND INFORMATION
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?AFTER YOUR FIRST CONSULTATION
      Click Here For More Info
    • Lighting Design

      • What is it?LIGHTING DESIGN TECHNICAL COORDINATION
      • Who Is It For?FOR THE PROFESSIONAL TEAM AND INSTALLERS
      • Why Do You Need It?IT ALL YOU NEED TO KNOW ABOUT LIGHTING AND THE CONTROL SYSTEM
      • Where Does It Fit In?INSIDE THE DETAILED DESIGN
      • When Do You Need It?WHEN YOU ARE PRODUCING A TENDER PACK
      Click Here For More Info
    • Concept Design

      • What is it?DIFFERENT WAYS TO PRESENT A SOLUTION THE THE END USER
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?TO GIVE YOU THE INFO TO CHOOSE THE RIGHT SOLUTION
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?BEFORE YOU START DETAILED DESIGN
      Click Here For More Info
    • Custom Design

      • What is it?A DESIGN THAT'S NOT BEEN DONE BEFORE
      • Who Is It For?ANYONE LOOKING FOR SOMETHING BESPOKE
      • Why Do You Need It?IT'S A ONE OFF SO YOU'LL TELL US
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?AS SOON AS POSSIBLE IN THE DESIGN PHASE
      Click Here For More Info
    • ITT

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tendering Analysis

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tender Pack

      • What is it?A PACK OF DOCUMENTS WITH ALL YOU NEED TO KNOW FOR TENDERING
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO GET ALL ESSENTIAL PROJECT INFO INTO ONE PLACE FOR PROCESSING
      • Where Does It Fit In?INSIDE THE TENDER INVITE
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Programmes

      • What is it?A HIGH LEVEL PROJECT PLAN IN LINE WITH CONSTRUCTION PROGRAMME
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO ENSURE TENDERS UNDERSTAND AND CAN COMMIT TO DELIVERY DATES
      • Where Does It Fit In?INSIDE THE TENDER PACK
      • When Do You Need It?AT STAGE 1 TENDER
      Click Here For More Info
    • Contracts

      • What is it?A DETAILED AND BINDING AGREEMENT, TAILORED, NOT OFF THE SHELF
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO GET EVERYTHING AGREED IN WRITING UP FRONT
      • Where Does It Fit In?INSIDE THE MAIN CONTRACT OR SEPARATE
      • When Do You Need It?BEFORE APPOINTMENT AND BEFORE WORK BEGINS
      Click Here For More Info
    • Tendering Reply
      Acknowledgement

      • What is it?A WRITTEN RESPONSE TO ALL THE UNSUCCESSFUL TENDERERS
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO SHOW APPRECIATION FOR THE TIME IT TAKES TO REPLY TO A TENDER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AT THE END OF THE TENDER PROCESS. LAST JOB.
      Click Here For More Info

  • LIVE CONTRACT
    • Consultancy
    • Design
    • Tendering
    • AVGA

      • What is it?Audio Visual General Arrangement
      • Who Is It For?Primarily for the end user
      • Why Do You Need It?TO MAKE SURE YOU KNOW ALL YOU NEED TO ABOUT A ROOM
      • Where Does It Fit In?Inside Concept Design
      • When Do You Need It?Before you start detailed design
      Click Here For More Info
    • Concept Design

      • What is it?DIFFERENT WAYS TO PRESENT A SOLUTION THE THE END USER
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?TO GIVE YOU THE INFO TO CHOOSE THE RIGHT SOLUTION
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?BEFORE YOU START DETAILED DESIGN
      Click Here For More Info
    • Custom Design

      • What is it?A DESIGN THAT'S NOT BEEN DONE BEFORE
      • Who Is It For?ANYONE LOOKING FOR SOMETHING BESPOKE
      • Why Do You Need It?IT'S A ONE OFF SO YOU'LL TELL US
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?AS SOON AS POSSIBLE IN THE DESIGN PHASE
      Click Here For More Info
    • Lighting Design

      • What is it?LIGHTING DESIGN TECHNICAL COORDINATION
      • Who Is It For?FOR THE PROFESSIONAL TEAM AND INSTALLERS
      • Why Do You Need It?IT ALL YOU NEED TO KNOW ABOUT LIGHTING AND THE CONTROL SYSTEM
      • Where Does It Fit In?INSIDE THE DETAILED DESIGN
      • When Do You Need It?WHEN YOU ARE PRODUCING A TENDER PACK
      Click Here For More Info
    • MATRICES & SPEC SHEETS

      • What is it?PRODUCTS MATRICES AND DETAILED SPECIFICATIONS
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?IT GIVES YOU OPTIONS AND INFORMATION
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?AFTER YOUR FIRST CONSULTATION
      Click Here For More Info
    • QUICK REF SCHEMATIC

      • What is it?A QUICK REFERENCE SCHEMATIC
      • Who Is It For?THE FIRST FIXERS
      • Why Do You Need It?IT'S QUICK AND EASY TO FOLLOW
      • Where Does It Fit In?THE CONSTRUCTION ISSUE PACK
      • When Do You Need It?BEFORE YOU START FIRST FIX
      Click Here For More Info
    • Value Engineering

      • What is it?AN EXERCISE IN MAINTAINING QUALITY WHILST REDUCING COSTS
      • Who Is It For?FOR THE PERSON IN CHARGE OF THE NUMBERS
      • Why Do You Need It?TO SAVE MONEY
      • Where Does It Fit In?MOSTLY INSIDE THE TENDER STAGE
      • When Do You Need It?IDEALLY BEFORE YOU APPOINT
      Click Here For More Info
    • Client Questionnaire

      • What is it?A MOSTLY MULTIPLE CHOICE CHECK LIST OF WANTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO BEGIN THE PROCESS OF UNDERSTANDING THE REQUIREMENT
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?DURING THE FIRST OR SECOND CONSULTATION
      Click Here For More Info
    • VAT Exemptions

      • What is it?GUIDANCE ON DIFFERENT VAT RATES IN CONTEXT OF CONTRACT
      • Who Is It For?FOR YOUR AV/SYSTEM INTEGRATOR
      • Why Do You Need It?TO ENSURE CORRECT RATES OF VAT ARE APPLIED
      • Where Does It Fit In?INSIDE TENDER INVITE PACK
      • When Do You Need It?DURING STAGE ONE TENDER
      Click Here For More Info
    • Existing System Audit

      • What is it?A FULL SYSTEM HEALTH CHECK. ALL ROOMS. ALL COMPONENTS
      • Who Is It For?FOR THE OWNER (OR FUTURE OWNER)
      • Why Do You Need It?TO IDENTIFY WHAT'S WORKING, WHAT'S NOT AND REMEDIAL COSTS
      • Where Does It Fit In?INSIDE A LARGER PROPETY SURVEY
      • When Do You Need It?BEFORE YOU DECIDE TO UPGRADE/CHANGE/FIX/COMMIT
      Click Here For More Info
    • System Takeover Report

      • What is it?WHAT YOU NEED TO KNOW BEFORE YOU CHANGE AV SUPPLIER
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?KNOW YOUR POSITION BEFORE YOU MAKE A CHANGE
      • Where Does It Fit In?ALONG SIDE EXISTING PROJECT INFO OR O&M
      • When Do You Need It?BEFORE YOU APPOINT A NEW SUPPLIER
      Click Here For More Info
    • Performance Spec
      and Cost Summary

      • What is it?A SNAPSHOT OF WHAT YOU'RE GETTING AND HOW MUCH IT COSTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO SAVE YOU HAVING TO READ ALL PROJECT DOCS
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?BEFORE YOU MOVE TO DETAILED DESIGN
      Click Here For More Info
    • ITT

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tendering Analysis

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tender Pack

      • What is it?A PACK OF DOCUMENTS WITH ALL YOU NEED TO KNOW FOR TENDERING
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO GET ALL ESSENTIAL PROJECT INFO INTO ONE PLACE FOR PROCESSING
      • Where Does It Fit In?INSIDE THE TENDER INVITE
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Programmes

      • What is it?A HIGH LEVEL PROJECT PLAN IN LINE WITH CONSTRUCTION PROGRAMME
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO ENSURE TENDERS UNDERSTAND AND CAN COMMIT TO DELIVERY DATES
      • Where Does It Fit In?INSIDE THE TENDER PACK
      • When Do You Need It?AT STAGE 1 TENDER
      Click Here For More Info
    • Contracts

      • What is it?A DETAILED AND BINDING AGREEMENT, TAILORED, NOT OFF THE SHELF
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO GET EVERYTHING AGREED IN WRITING UP FRONT
      • Where Does It Fit In?INSIDE THE MAIN CONTRACT OR SEPARATE
      • When Do You Need It?BEFORE APPOINTMENT AND BEFORE WORK BEGINS
      Click Here For More Info
    • Tendering Reply
      Acknowledgement

      • What is it?A WRITTEN RESPONSE TO ALL THE UNSUCCESSFUL TENDERERS
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO SHOW APPRECIATION FOR THE TIME IT TAKES TO REPLY TO A TENDER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AT THE END OF THE TENDER PROCESS. LAST JOB.
      Click Here For More Info
    • AVGA

      • What is it?Audio Visual General Arrangement
      • Who Is It For?Primarily for the end user
      • Why Do You Need It?TO MAKE SURE YOU KNOW ALL YOU NEED TO ABOUT A ROOM
      • Where Does It Fit In?Inside Concept Design
      • When Do You Need It?Before you start detailed design
      Click Here For More Info
    • Concept Design

      • What is it?DIFFERENT WAYS TO PRESENT A SOLUTION THE THE END USER
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?TO GIVE YOU THE INFO TO CHOOSE THE RIGHT SOLUTION
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?BEFORE YOU START DETAILED DESIGN
      Click Here For More Info
    • Custom Design

      • What is it?A DESIGN THAT'S NOT BEEN DONE BEFORE
      • Who Is It For?ANYONE LOOKING FOR SOMETHING BESPOKE
      • Why Do You Need It?IT'S A ONE OFF SO YOU'LL TELL US
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?AS SOON AS POSSIBLE IN THE DESIGN PHASE
      Click Here For More Info
    • Lighting Design

      • What is it?LIGHTING DESIGN TECHNICAL COORDINATION
      • Who Is It For?FOR THE PROFESSIONAL TEAM AND INSTALLERS
      • Why Do You Need It?IT ALL YOU NEED TO KNOW ABOUT LIGHTING AND THE CONTROL SYSTEM
      • Where Does It Fit In?INSIDE THE DETAILED DESIGN
      • When Do You Need It?WHEN YOU ARE PRODUCING A TENDER PACK
      Click Here For More Info
    • MATRICES & SPEC SHEETS

      • What is it?PRODUCTS MATRICES AND DETAILED SPECIFICATIONS
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?IT GIVES YOU OPTIONS AND INFORMATION
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?AFTER YOUR FIRST CONSULTATION
      Click Here For More Info
    • QUICK REF SCHEMATIC

      • What is it?A QUICK REFERENCE SCHEMATIC
      • Who Is It For?THE FIRST FIXERS
      • Why Do You Need It?IT'S QUICK AND EASY TO FOLLOW
      • Where Does It Fit In?THE CONSTRUCTION ISSUE PACK
      • When Do You Need It?BEFORE YOU START FIRST FIX
      Click Here For More Info
    • Value Engineering

      • What is it?AN EXERCISE IN MAINTAINING QUALITY WHILST REDUCING COSTS
      • Who Is It For?FOR THE PERSON IN CHARGE OF THE NUMBERS
      • Why Do You Need It?TO SAVE MONEY
      • Where Does It Fit In?MOSTLY INSIDE THE TENDER STAGE
      • When Do You Need It?IDEALLY BEFORE YOU APPOINT
      Click Here For More Info
    • Client Questionnaire

      • What is it?A MOSTLY MULTIPLE CHOICE CHECK LIST OF WANTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO BEGIN THE PROCESS OF UNDERSTANDING THE REQUIREMENT
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?DURING THE FIRST OR SECOND CONSULTATION
      Click Here For More Info
    • VAT Exemptions

      • What is it?GUIDANCE ON DIFFERENT VAT RATES IN CONTEXT OF CONTRACT
      • Who Is It For?FOR YOUR AV/SYSTEM INTEGRATOR
      • Why Do You Need It?TO ENSURE CORRECT RATES OF VAT ARE APPLIED
      • Where Does It Fit In?INSIDE TENDER INVITE PACK
      • When Do You Need It?DURING STAGE ONE TENDER
      Click Here For More Info
    • Existing System Audit

      • What is it?A FULL SYSTEM HEALTH CHECK. ALL ROOMS. ALL COMPONENTS
      • Who Is It For?FOR THE OWNER (OR FUTURE OWNER)
      • Why Do You Need It?TO IDENTIFY WHAT'S WORKING, WHAT'S NOT AND REMEDIAL COSTS
      • Where Does It Fit In?INSIDE A LARGER PROPETY SURVEY
      • When Do You Need It?BEFORE YOU DECIDE TO UPGRADE/CHANGE/FIX/COMMIT
      Click Here For More Info
    • System Takeover Report

      • What is it?WHAT YOU NEED TO KNOW BEFORE YOU CHANGE AV SUPPLIER
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?KNOW YOUR POSITION BEFORE YOU MAKE A CHANGE
      • Where Does It Fit In?ALONG SIDE EXISTING PROJECT INFO OR O&M
      • When Do You Need It?BEFORE YOU APPOINT A NEW SUPPLIER
      Click Here For More Info
    • Performance Spec
      and Cost Summary

      • What is it?A SNAPSHOT OF WHAT YOU'RE GETTING AND HOW MUCH IT COSTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO SAVE YOU HAVING TO READ ALL PROJECT DOCS
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?BEFORE YOU MOVE TO DETAILED DESIGN
      Click Here For More Info
    • ITT

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tendering Analysis

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tender Pack

      • What is it?A PACK OF DOCUMENTS WITH ALL YOU NEED TO KNOW FOR TENDERING
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO GET ALL ESSENTIAL PROJECT INFO INTO ONE PLACE FOR PROCESSING
      • Where Does It Fit In?INSIDE THE TENDER INVITE
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Programmes

      • What is it?A HIGH LEVEL PROJECT PLAN IN LINE WITH CONSTRUCTION PROGRAMME
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO ENSURE TENDERS UNDERSTAND AND CAN COMMIT TO DELIVERY DATES
      • Where Does It Fit In?INSIDE THE TENDER PACK
      • When Do You Need It?AT STAGE 1 TENDER
      Click Here For More Info
    • Contracts

      • What is it?A DETAILED AND BINDING AGREEMENT, TAILORED, NOT OFF THE SHELF
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO GET EVERYTHING AGREED IN WRITING UP FRONT
      • Where Does It Fit In?INSIDE THE MAIN CONTRACT OR SEPARATE
      • When Do You Need It?BEFORE APPOINTMENT AND BEFORE WORK BEGINS
      Click Here For More Info
    • Tendering Reply
      Acknowledgement

      • What is it?A WRITTEN RESPONSE TO ALL THE UNSUCCESSFUL TENDERERS
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO SHOW APPRECIATION FOR THE TIME IT TAKES TO REPLY TO A TENDER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AT THE END OF THE TENDER PROCESS. LAST JOB.
      Click Here For More Info
    • AVGA

      • What is it?Audio Visual General Arrangement
      • Who Is It For?Primarily for the end user
      • Why Do You Need It?TO MAKE SURE YOU KNOW ALL YOU NEED TO ABOUT A ROOM
      • Where Does It Fit In?Inside Concept Design
      • When Do You Need It?Before you start detailed design
      Click Here For More Info
    • Concept Design

      • What is it?DIFFERENT WAYS TO PRESENT A SOLUTION THE THE END USER
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?TO GIVE YOU THE INFO TO CHOOSE THE RIGHT SOLUTION
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?BEFORE YOU START DETAILED DESIGN
      Click Here For More Info
    • Custom Design

      • What is it?A DESIGN THAT'S NOT BEEN DONE BEFORE
      • Who Is It For?ANYONE LOOKING FOR SOMETHING BESPOKE
      • Why Do You Need It?IT'S A ONE OFF SO YOU'LL TELL US
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?AS SOON AS POSSIBLE IN THE DESIGN PHASE
      Click Here For More Info
    • Lighting Design

      • What is it?LIGHTING DESIGN TECHNICAL COORDINATION
      • Who Is It For?FOR THE PROFESSIONAL TEAM AND INSTALLERS
      • Why Do You Need It?IT ALL YOU NEED TO KNOW ABOUT LIGHTING AND THE CONTROL SYSTEM
      • Where Does It Fit In?INSIDE THE DETAILED DESIGN
      • When Do You Need It?WHEN YOU ARE PRODUCING A TENDER PACK
      Click Here For More Info
    • MATRICES & SPEC SHEETS

      • What is it?PRODUCTS MATRICES AND DETAILED SPECIFICATIONS
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?IT GIVES YOU OPTIONS AND INFORMATION
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?AFTER YOUR FIRST CONSULTATION
      Click Here For More Info
    • QUICK REF SCHEMATIC

      • What is it?A QUICK REFERENCE SCHEMATIC
      • Who Is It For?THE FIRST FIXERS
      • Why Do You Need It?IT'S QUICK AND EASY TO FOLLOW
      • Where Does It Fit In?THE CONSTRUCTION ISSUE PACK
      • When Do You Need It?BEFORE YOU START FIRST FIX
      Click Here For More Info
    • Value Engineering

      • What is it?AN EXERCISE IN MAINTAINING QUALITY WHILST REDUCING COSTS
      • Who Is It For?FOR THE PERSON IN CHARGE OF THE NUMBERS
      • Why Do You Need It?TO SAVE MONEY
      • Where Does It Fit In?MOSTLY INSIDE THE TENDER STAGE
      • When Do You Need It?IDEALLY BEFORE YOU APPOINT
      Click Here For More Info
    • Client Questionnaire

      • What is it?A MOSTLY MULTIPLE CHOICE CHECK LIST OF WANTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO BEGIN THE PROCESS OF UNDERSTANDING THE REQUIREMENT
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?DURING THE FIRST OR SECOND CONSULTATION
      Click Here For More Info
    • VAT Exemptions

      • What is it?GUIDANCE ON DIFFERENT VAT RATES IN CONTEXT OF CONTRACT
      • Who Is It For?FOR YOUR AV/SYSTEM INTEGRATOR
      • Why Do You Need It?TO ENSURE CORRECT RATES OF VAT ARE APPLIED
      • Where Does It Fit In?INSIDE TENDER INVITE PACK
      • When Do You Need It?DURING STAGE ONE TENDER
      Click Here For More Info
    • Existing System Audit

      • What is it?A FULL SYSTEM HEALTH CHECK. ALL ROOMS. ALL COMPONENTS
      • Who Is It For?FOR THE OWNER (OR FUTURE OWNER)
      • Why Do You Need It?TO IDENTIFY WHAT'S WORKING, WHAT'S NOT AND REMEDIAL COSTS
      • Where Does It Fit In?INSIDE A LARGER PROPETY SURVEY
      • When Do You Need It?BEFORE YOU DECIDE TO UPGRADE/CHANGE/FIX/COMMIT
      Click Here For More Info
    • System Takeover Report

      • What is it?WHAT YOU NEED TO KNOW BEFORE YOU CHANGE AV SUPPLIER
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?KNOW YOUR POSITION BEFORE YOU MAKE A CHANGE
      • Where Does It Fit In?ALONG SIDE EXISTING PROJECT INFO OR O&M
      • When Do You Need It?BEFORE YOU APPOINT A NEW SUPPLIER
      Click Here For More Info
    • Performance Spec
      and Cost Summary

      • What is it?A SNAPSHOT OF WHAT YOU'RE GETTING AND HOW MUCH IT COSTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO SAVE YOU HAVING TO READ ALL PROJECT DOCS
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?BEFORE YOU MOVE TO DETAILED DESIGN
      Click Here For More Info
    • ITT

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tendering Analysis

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tender Pack

      • What is it?A PACK OF DOCUMENTS WITH ALL YOU NEED TO KNOW FOR TENDERING
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO GET ALL ESSENTIAL PROJECT INFO INTO ONE PLACE FOR PROCESSING
      • Where Does It Fit In?INSIDE THE TENDER INVITE
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Programmes

      • What is it?A HIGH LEVEL PROJECT PLAN IN LINE WITH CONSTRUCTION PROGRAMME
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO ENSURE TENDERS UNDERSTAND AND CAN COMMIT TO DELIVERY DATES
      • Where Does It Fit In?INSIDE THE TENDER PACK
      • When Do You Need It?AT STAGE 1 TENDER
      Click Here For More Info
    • Contracts

      • What is it?A DETAILED AND BINDING AGREEMENT, TAILORED, NOT OFF THE SHELF
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO GET EVERYTHING AGREED IN WRITING UP FRONT
      • Where Does It Fit In?INSIDE THE MAIN CONTRACT OR SEPARATE
      • When Do You Need It?BEFORE APPOINTMENT AND BEFORE WORK BEGINS
      Click Here For More Info
    • Tendering Reply
      Acknowledgement

      • What is it?A WRITTEN RESPONSE TO ALL THE UNSUCCESSFUL TENDERERS
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO SHOW APPRECIATION FOR THE TIME IT TAKES TO REPLY TO A TENDER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AT THE END OF THE TENDER PROCESS. LAST JOB.
      Click Here For More Info

  • POST CONTRACT
    • Consultancy
    • Design
    • Tendering
    • AVGA

      • What is it?Audio Visual General Arrangement
      • Who Is It For?Primarily for the end user
      • Why Do You Need It?TO MAKE SURE YOU KNOW ALL YOU NEED TO ABOUT A ROOM
      • Where Does It Fit In?Inside Concept Design
      • When Do You Need It?Before you start detailed design
      Click Here For More Info
    • Concept Design

      • What is it?DIFFERENT WAYS TO PRESENT A SOLUTION THE THE END USER
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?TO GIVE YOU THE INFO TO CHOOSE THE RIGHT SOLUTION
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?BEFORE YOU START DETAILED DESIGN
      Click Here For More Info
    • Custom Design

      • What is it?A DESIGN THAT'S NOT BEEN DONE BEFORE
      • Who Is It For?ANYONE LOOKING FOR SOMETHING BESPOKE
      • Why Do You Need It?IT'S A ONE OFF SO YOU'LL TELL US
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?AS SOON AS POSSIBLE IN THE DESIGN PHASE
      Click Here For More Info
    • Lighting Design

      • What is it?LIGHTING DESIGN TECHNICAL COORDINATION
      • Who Is It For?FOR THE PROFESSIONAL TEAM AND INSTALLERS
      • Why Do You Need It?IT ALL YOU NEED TO KNOW ABOUT LIGHTING AND THE CONTROL SYSTEM
      • Where Does It Fit In?INSIDE THE DETAILED DESIGN
      • When Do You Need It?WHEN YOU ARE PRODUCING A TENDER PACK
      Click Here For More Info
    • MATRICES & SPEC SHEETS

      • What is it?PRODUCTS MATRICES AND DETAILED SPECIFICATIONS
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?IT GIVES YOU OPTIONS AND INFORMATION
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?AFTER YOUR FIRST CONSULTATION
      Click Here For More Info
    • QUICK REF SCHEMATIC

      • What is it?A QUICK REFERENCE SCHEMATIC
      • Who Is It For?THE FIRST FIXERS
      • Why Do You Need It?IT'S QUICK AND EASY TO FOLLOW
      • Where Does It Fit In?THE CONSTRUCTION ISSUE PACK
      • When Do You Need It?BEFORE YOU START FIRST FIX
      Click Here For More Info
    • Value Engineering

      • What is it?AN EXERCISE IN MAINTAINING QUALITY WHILST REDUCING COSTS
      • Who Is It For?FOR THE PERSON IN CHARGE OF THE NUMBERS
      • Why Do You Need It?TO SAVE MONEY
      • Where Does It Fit In?MOSTLY INSIDE THE TENDER STAGE
      • When Do You Need It?IDEALLY BEFORE YOU APPOINT
      Click Here For More Info
    • Client Questionnaire

      • What is it?A MOSTLY MULTIPLE CHOICE CHECK LIST OF WANTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO BEGIN THE PROCESS OF UNDERSTANDING THE REQUIREMENT
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?DURING THE FIRST OR SECOND CONSULTATION
      Click Here For More Info
    • VAT Exemptions

      • What is it?GUIDANCE ON DIFFERENT VAT RATES IN CONTEXT OF CONTRACT
      • Who Is It For?FOR YOUR AV/SYSTEM INTEGRATOR
      • Why Do You Need It?TO ENSURE CORRECT RATES OF VAT ARE APPLIED
      • Where Does It Fit In?INSIDE TENDER INVITE PACK
      • When Do You Need It?DURING STAGE ONE TENDER
      Click Here For More Info
    • Existing System Audit

      • What is it?A FULL SYSTEM HEALTH CHECK. ALL ROOMS. ALL COMPONENTS
      • Who Is It For?FOR THE OWNER (OR FUTURE OWNER)
      • Why Do You Need It?TO IDENTIFY WHAT'S WORKING, WHAT'S NOT AND REMEDIAL COSTS
      • Where Does It Fit In?INSIDE A LARGER PROPETY SURVEY
      • When Do You Need It?BEFORE YOU DECIDE TO UPGRADE/CHANGE/FIX/COMMIT
      Click Here For More Info
    • System Takeover Report

      • What is it?WHAT YOU NEED TO KNOW BEFORE YOU CHANGE AV SUPPLIER
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?KNOW YOUR POSITION BEFORE YOU MAKE A CHANGE
      • Where Does It Fit In?ALONG SIDE EXISTING PROJECT INFO OR O&M
      • When Do You Need It?BEFORE YOU APPOINT A NEW SUPPLIER
      Click Here For More Info
    • Performance Spec
      and Cost Summary

      • What is it?A SNAPSHOT OF WHAT YOU'RE GETTING AND HOW MUCH IT COSTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO SAVE YOU HAVING TO READ ALL PROJECT DOCS
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?BEFORE YOU MOVE TO DETAILED DESIGN
      Click Here For More Info
    • ITT

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tendering Analysis

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tender Pack

      • What is it?A PACK OF DOCUMENTS WITH ALL YOU NEED TO KNOW FOR TENDERING
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO GET ALL ESSENTIAL PROJECT INFO INTO ONE PLACE FOR PROCESSING
      • Where Does It Fit In?INSIDE THE TENDER INVITE
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Programmes

      • What is it?A HIGH LEVEL PROJECT PLAN IN LINE WITH CONSTRUCTION PROGRAMME
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO ENSURE TENDERS UNDERSTAND AND CAN COMMIT TO DELIVERY DATES
      • Where Does It Fit In?INSIDE THE TENDER PACK
      • When Do You Need It?AT STAGE 1 TENDER
      Click Here For More Info
    • Contracts

      • What is it?A DETAILED AND BINDING AGREEMENT, TAILORED, NOT OFF THE SHELF
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO GET EVERYTHING AGREED IN WRITING UP FRONT
      • Where Does It Fit In?INSIDE THE MAIN CONTRACT OR SEPARATE
      • When Do You Need It?BEFORE APPOINTMENT AND BEFORE WORK BEGINS
      Click Here For More Info
    • Tendering Reply
      Acknowledgement

      • What is it?A WRITTEN RESPONSE TO ALL THE UNSUCCESSFUL TENDERERS
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO SHOW APPRECIATION FOR THE TIME IT TAKES TO REPLY TO A TENDER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AT THE END OF THE TENDER PROCESS. LAST JOB.
      Click Here For More Info
    • AVGA

      • What is it?Audio Visual General Arrangement
      • Who Is It For?Primarily for the end user
      • Why Do You Need It?TO MAKE SURE YOU KNOW ALL YOU NEED TO ABOUT A ROOM
      • Where Does It Fit In?Inside Concept Design
      • When Do You Need It?Before you start detailed design
      Click Here For More Info
    • Concept Design

      • What is it?DIFFERENT WAYS TO PRESENT A SOLUTION THE THE END USER
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?TO GIVE YOU THE INFO TO CHOOSE THE RIGHT SOLUTION
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?BEFORE YOU START DETAILED DESIGN
      Click Here For More Info
    • Custom Design

      • What is it?A DESIGN THAT'S NOT BEEN DONE BEFORE
      • Who Is It For?ANYONE LOOKING FOR SOMETHING BESPOKE
      • Why Do You Need It?IT'S A ONE OFF SO YOU'LL TELL US
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?AS SOON AS POSSIBLE IN THE DESIGN PHASE
      Click Here For More Info
    • Lighting Design

      • What is it?LIGHTING DESIGN TECHNICAL COORDINATION
      • Who Is It For?FOR THE PROFESSIONAL TEAM AND INSTALLERS
      • Why Do You Need It?IT ALL YOU NEED TO KNOW ABOUT LIGHTING AND THE CONTROL SYSTEM
      • Where Does It Fit In?INSIDE THE DETAILED DESIGN
      • When Do You Need It?WHEN YOU ARE PRODUCING A TENDER PACK
      Click Here For More Info
    • MATRICES & SPEC SHEETS

      • What is it?PRODUCTS MATRICES AND DETAILED SPECIFICATIONS
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?IT GIVES YOU OPTIONS AND INFORMATION
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?AFTER YOUR FIRST CONSULTATION
      Click Here For More Info
    • QUICK REF SCHEMATIC

      • What is it?A QUICK REFERENCE SCHEMATIC
      • Who Is It For?THE FIRST FIXERS
      • Why Do You Need It?IT'S QUICK AND EASY TO FOLLOW
      • Where Does It Fit In?THE CONSTRUCTION ISSUE PACK
      • When Do You Need It?BEFORE YOU START FIRST FIX
      Click Here For More Info
    • Value Engineering

      • What is it?AN EXERCISE IN MAINTAINING QUALITY WHILST REDUCING COSTS
      • Who Is It For?FOR THE PERSON IN CHARGE OF THE NUMBERS
      • Why Do You Need It?TO SAVE MONEY
      • Where Does It Fit In?MOSTLY INSIDE THE TENDER STAGE
      • When Do You Need It?IDEALLY BEFORE YOU APPOINT
      Click Here For More Info
    • Client Questionnaire

      • What is it?A MOSTLY MULTIPLE CHOICE CHECK LIST OF WANTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO BEGIN THE PROCESS OF UNDERSTANDING THE REQUIREMENT
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?DURING THE FIRST OR SECOND CONSULTATION
      Click Here For More Info
    • VAT Exemptions

      • What is it?GUIDANCE ON DIFFERENT VAT RATES IN CONTEXT OF CONTRACT
      • Who Is It For?FOR YOUR AV/SYSTEM INTEGRATOR
      • Why Do You Need It?TO ENSURE CORRECT RATES OF VAT ARE APPLIED
      • Where Does It Fit In?INSIDE TENDER INVITE PACK
      • When Do You Need It?DURING STAGE ONE TENDER
      Click Here For More Info
    • Existing System Audit

      • What is it?A FULL SYSTEM HEALTH CHECK. ALL ROOMS. ALL COMPONENTS
      • Who Is It For?FOR THE OWNER (OR FUTURE OWNER)
      • Why Do You Need It?TO IDENTIFY WHAT'S WORKING, WHAT'S NOT AND REMEDIAL COSTS
      • Where Does It Fit In?INSIDE A LARGER PROPETY SURVEY
      • When Do You Need It?BEFORE YOU DECIDE TO UPGRADE/CHANGE/FIX/COMMIT
      Click Here For More Info
    • System Takeover Report

      • What is it?WHAT YOU NEED TO KNOW BEFORE YOU CHANGE AV SUPPLIER
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?KNOW YOUR POSITION BEFORE YOU MAKE A CHANGE
      • Where Does It Fit In?ALONG SIDE EXISTING PROJECT INFO OR O&M
      • When Do You Need It?BEFORE YOU APPOINT A NEW SUPPLIER
      Click Here For More Info
    • Performance Spec
      and Cost Summary

      • What is it?A SNAPSHOT OF WHAT YOU'RE GETTING AND HOW MUCH IT COSTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO SAVE YOU HAVING TO READ ALL PROJECT DOCS
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?BEFORE YOU MOVE TO DETAILED DESIGN
      Click Here For More Info
    • ITT

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tendering Analysis

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tender Pack

      • What is it?A PACK OF DOCUMENTS WITH ALL YOU NEED TO KNOW FOR TENDERING
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO GET ALL ESSENTIAL PROJECT INFO INTO ONE PLACE FOR PROCESSING
      • Where Does It Fit In?INSIDE THE TENDER INVITE
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Programmes

      • What is it?A HIGH LEVEL PROJECT PLAN IN LINE WITH CONSTRUCTION PROGRAMME
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO ENSURE TENDERS UNDERSTAND AND CAN COMMIT TO DELIVERY DATES
      • Where Does It Fit In?INSIDE THE TENDER PACK
      • When Do You Need It?AT STAGE 1 TENDER
      Click Here For More Info
    • Contracts

      • What is it?A DETAILED AND BINDING AGREEMENT, TAILORED, NOT OFF THE SHELF
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO GET EVERYTHING AGREED IN WRITING UP FRONT
      • Where Does It Fit In?INSIDE THE MAIN CONTRACT OR SEPARATE
      • When Do You Need It?BEFORE APPOINTMENT AND BEFORE WORK BEGINS
      Click Here For More Info
    • Tendering Reply
      Acknowledgement

      • What is it?A WRITTEN RESPONSE TO ALL THE UNSUCCESSFUL TENDERERS
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO SHOW APPRECIATION FOR THE TIME IT TAKES TO REPLY TO A TENDER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AT THE END OF THE TENDER PROCESS. LAST JOB.
      Click Here For More Info
    • AVGA

      • What is it?Audio Visual General Arrangement
      • Who Is It For?Primarily for the end user
      • Why Do You Need It?TO MAKE SURE YOU KNOW ALL YOU NEED TO ABOUT A ROOM
      • Where Does It Fit In?Inside Concept Design
      • When Do You Need It?Before you start detailed design
      Click Here For More Info
    • Concept Design

      • What is it?DIFFERENT WAYS TO PRESENT A SOLUTION THE THE END USER
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?TO GIVE YOU THE INFO TO CHOOSE THE RIGHT SOLUTION
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?BEFORE YOU START DETAILED DESIGN
      Click Here For More Info
    • Custom Design

      • What is it?A DESIGN THAT'S NOT BEEN DONE BEFORE
      • Who Is It For?ANYONE LOOKING FOR SOMETHING BESPOKE
      • Why Do You Need It?IT'S A ONE OFF SO YOU'LL TELL US
      • Where Does It Fit In?INSIDE THE DESIGN PACK
      • When Do You Need It?AS SOON AS POSSIBLE IN THE DESIGN PHASE
      Click Here For More Info
    • Lighting Design

      • What is it?LIGHTING DESIGN TECHNICAL COORDINATION
      • Who Is It For?FOR THE PROFESSIONAL TEAM AND INSTALLERS
      • Why Do You Need It?IT ALL YOU NEED TO KNOW ABOUT LIGHTING AND THE CONTROL SYSTEM
      • Where Does It Fit In?INSIDE THE DETAILED DESIGN
      • When Do You Need It?WHEN YOU ARE PRODUCING A TENDER PACK
      Click Here For More Info
    • MATRICES & SPEC SHEETS

      • What is it?PRODUCTS MATRICES AND DETAILED SPECIFICATIONS
      • Who Is It For?PRIMARILY FOR THE END USER
      • Why Do You Need It?IT GIVES YOU OPTIONS AND INFORMATION
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?AFTER YOUR FIRST CONSULTATION
      Click Here For More Info
    • QUICK REF SCHEMATIC

      • What is it?A QUICK REFERENCE SCHEMATIC
      • Who Is It For?THE FIRST FIXERS
      • Why Do You Need It?IT'S QUICK AND EASY TO FOLLOW
      • Where Does It Fit In?THE CONSTRUCTION ISSUE PACK
      • When Do You Need It?BEFORE YOU START FIRST FIX
      Click Here For More Info
    • Value Engineering

      • What is it?AN EXERCISE IN MAINTAINING QUALITY WHILST REDUCING COSTS
      • Who Is It For?FOR THE PERSON IN CHARGE OF THE NUMBERS
      • Why Do You Need It?TO SAVE MONEY
      • Where Does It Fit In?MOSTLY INSIDE THE TENDER STAGE
      • When Do You Need It?IDEALLY BEFORE YOU APPOINT
      Click Here For More Info
    • Client Questionnaire

      • What is it?A MOSTLY MULTIPLE CHOICE CHECK LIST OF WANTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO BEGIN THE PROCESS OF UNDERSTANDING THE REQUIREMENT
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?DURING THE FIRST OR SECOND CONSULTATION
      Click Here For More Info
    • VAT Exemptions

      • What is it?GUIDANCE ON DIFFERENT VAT RATES IN CONTEXT OF CONTRACT
      • Who Is It For?FOR YOUR AV/SYSTEM INTEGRATOR
      • Why Do You Need It?TO ENSURE CORRECT RATES OF VAT ARE APPLIED
      • Where Does It Fit In?INSIDE TENDER INVITE PACK
      • When Do You Need It?DURING STAGE ONE TENDER
      Click Here For More Info
    • Existing System Audit

      • What is it?A FULL SYSTEM HEALTH CHECK. ALL ROOMS. ALL COMPONENTS
      • Who Is It For?FOR THE OWNER (OR FUTURE OWNER)
      • Why Do You Need It?TO IDENTIFY WHAT'S WORKING, WHAT'S NOT AND REMEDIAL COSTS
      • Where Does It Fit In?INSIDE A LARGER PROPETY SURVEY
      • When Do You Need It?BEFORE YOU DECIDE TO UPGRADE/CHANGE/FIX/COMMIT
      Click Here For More Info
    • System Takeover Report

      • What is it?WHAT YOU NEED TO KNOW BEFORE YOU CHANGE AV SUPPLIER
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?KNOW YOUR POSITION BEFORE YOU MAKE A CHANGE
      • Where Does It Fit In?ALONG SIDE EXISTING PROJECT INFO OR O&M
      • When Do You Need It?BEFORE YOU APPOINT A NEW SUPPLIER
      Click Here For More Info
    • Performance Spec
      and Cost Summary

      • What is it?A SNAPSHOT OF WHAT YOU'RE GETTING AND HOW MUCH IT COSTS
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO SAVE YOU HAVING TO READ ALL PROJECT DOCS
      • Where Does It Fit In?INSIDE CONCEPT DESIGN
      • When Do You Need It?BEFORE YOU MOVE TO DETAILED DESIGN
      Click Here For More Info
    • ITT

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tendering Analysis

      • What is it?INVITE TO TENDER, THE PROCESS FOR SEEKING QUOTES
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO FIND THE RIGHT PRICE WITH THE RIGHT SUPPLIER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Tender Pack

      • What is it?A PACK OF DOCUMENTS WITH ALL YOU NEED TO KNOW FOR TENDERING
      • Who Is It For?FOR THE PROJECT LEAD, CLIENT OR CLIENT REP
      • Why Do You Need It?TO GET ALL ESSENTIAL PROJECT INFO INTO ONE PLACE FOR PROCESSING
      • Where Does It Fit In?INSIDE THE TENDER INVITE
      • When Do You Need It?AFTER DETAILED DESIGN IS SIGNED OFF
      Click Here For More Info
    • Programmes

      • What is it?A HIGH LEVEL PROJECT PLAN IN LINE WITH CONSTRUCTION PROGRAMME
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO ENSURE TENDERS UNDERSTAND AND CAN COMMIT TO DELIVERY DATES
      • Where Does It Fit In?INSIDE THE TENDER PACK
      • When Do You Need It?AT STAGE 1 TENDER
      Click Here For More Info
    • Contracts

      • What is it?A DETAILED AND BINDING AGREEMENT, TAILORED, NOT OFF THE SHELF
      • Who Is It For?FOR THE END CLIENT
      • Why Do You Need It?TO GET EVERYTHING AGREED IN WRITING UP FRONT
      • Where Does It Fit In?INSIDE THE MAIN CONTRACT OR SEPARATE
      • When Do You Need It?BEFORE APPOINTMENT AND BEFORE WORK BEGINS
      Click Here For More Info
    • Tendering Reply
      Acknowledgement

      • What is it?A WRITTEN RESPONSE TO ALL THE UNSUCCESSFUL TENDERERS
      • Who Is It For?FOR THE TENDERERS
      • Why Do You Need It?TO SHOW APPRECIATION FOR THE TIME IT TAKES TO REPLY TO A TENDER
      • Where Does It Fit In?INSIDE THE TENDER PROCESS
      • When Do You Need It?AT THE END OF THE TENDER PROCESS. LAST JOB.
      Click Here For More Info

  • 01360 729 426
  • info@infracorehtc.co.uk
  • Copyright Infracore Group (Scotland) Ltd
  • Company registration no. SC622590
  • Privacy policy
  • Contact Us

Copyright © 2021 · Dynamik-Gen on Genesis Framework · WordPress · Log in